How to Write a Software Requirements Document

On this page
  1. Why write requirements before you talk to developers?
  2. What should a requirements document include?
  3. How do you write the problem statement?
  4. Who are the users, and what can each role do?
  5. How do you write user stories and acceptance criteria?
  6. How do you prioritize with must, should and could?
  7. What about data and integrations?
  8. What are non-functional requirements?
  9. Why does "out of scope" matter so much?
  10. How detailed should the document be?
  11. How do you use it to get comparable quotes?
  12. A fill-in requirements template

Why write requirements before you talk to developers?

Because the first conversation strongly shapes the price. If you describe a project in two sentences on a call, every agency fills the gaps with its own guesses, and you get quotes that are impossible to compare. One assumes a simple web form, another assumes a mobile app with offline mode, a third assumes integration with your accounting system. The numbers differ because the projects differ.

A requirements document fixes that. It is a written description of what the software must do for your business, who will use it, and how you will judge whether it works. It is not a technical design. You describe the problem and the outcomes; the agency proposes how to build it.

It also settles disputes later: a written requirement beats anyone's memory of a meeting. If you are still deciding whether to build at all, read custom software vs. off-the-shelf first. This guide assumes you have decided that custom software or a custom layer on top of existing tools is worth exploring.

What should a requirements document include?

Seven sections cover almost every small or mid-size project. Each one answers a question an agency would otherwise have to guess at:

  1. Problem statement: what is going wrong today, and what better looks like.
  2. Users and roles: who will use the system and what each type of user may see or do.
  3. User stories and acceptance criteria: the tasks people must complete, and how you will check each one.
  4. Priorities: what must be in the first release and what can wait.
  5. Data and integrations: what information the system holds and which other systems it talks to.
  6. Non-functional needs: security, performance, accessibility, compliance, support.
  7. Out of scope: what this project will not do.

The rest of this guide walks through each section with an illustrative example: a regional HVAC company with a dozen technicians that wants to replace its paper work orders and group texts with a simple job app.

How do you write the problem statement?

Start with the business problem in plain language, then describe the outcome you want. Avoid naming a solution yet. "We need an app" is a solution; "technicians lose time and we lose billable parts" is a problem.

A strong problem statement fits in a short paragraph and includes:

  • What happens today, step by step, and where it breaks.
  • Who is affected and how often.
  • What it costs, in time, errors, missed revenue or customer complaints. Use your own numbers if you have them; rough estimates are fine if you label them.
  • What success looks like once the system is in place.

For the HVAC company it might read: "Dispatch assigns jobs by text message. Technicians write parts and labor on paper tickets that reach the office days later, and some never arrive. The office retypes every ticket into the accounting system. We want technicians to see their jobs, record parts, labor and photos on a phone, and have completed jobs reach the office the same day, ready to invoice."

Who are the users, and what can each role do?

List every type of person who will touch the system, including the ones who only check it once a week. For each role, note how many people, what device they will use, and what they need to see or change. Roles drive permissions, screens and often price, so missing one is expensive to fix later.

RoleHow manyDeviceCan doCannot do
Technician12Phone, in the fieldSee own jobs, record parts, labor, photos, customer signatureSee other technicians' jobs, change prices
Dispatcher2DesktopCreate and assign jobs, change schedulesEdit completed invoices
Office manager1DesktopReview completed jobs, send to accounting, run reportsDelete job history
Owner1Desktop and phoneEverything, including user accountsNothing restricted

The "cannot do" column matters as much as the first. It is where security and accountability get decided, and it forces conversations, such as whether a technician may edit a job after the customer has signed, that are much cheaper to have now.

How do you write user stories and acceptance criteria?

A user story describes one task from the user's point of view. The GOV.UK Service Manual's guide to writing user stories uses a three-part template: who the user is, what they need to do, and why. It stresses that the "why" is the most important part, because it shows whether you are solving the right problem.

For the HVAC company:

  • As a technician, I need to see today's jobs in order with the address and problem description, so that I can drive to the first job without calling the office.
  • As a technician, I need to record the parts I used from a list, so that the office can bill them without reading my handwriting.
  • As an office manager, I need to see every job completed today with its parts and labor, so that I can invoice the same day.

Each story then gets acceptance criteria: a short checklist that says when the story is done. The same GOV.UK guide describes them as outcomes, often written as "it's done when...". For the parts story:

  • The technician can search the parts list by name or part number.
  • Quantities can be entered, and the list shows the unit for each part.
  • A part not on the list can be added as free text and is flagged for the office.
  • Recorded parts appear on the office view once the job is marked complete.
  • Recording works when the phone has no signal and syncs when it reconnects.

That last line is where much of the cost hides. Offline support can be a significant piece of work, and an agency that sees it written down will price it; one that does not will either miss it or argue about it later. Acceptance criteria are where vague wishes become testable promises.

Do not try to write every story. Cover the main tasks for each role, the ones the business cannot run without, and note obvious gaps as open questions.

How do you prioritize with must, should and could?

Every list of features grows until it is unaffordable. Sorting it is your job, not the agency's, because only you know what the business can live without.

The MoSCoW method is the simplest tool for this. Nielsen Norman Group's overview of prioritization methods describes its four groups:

  • Must have: vital to the product or project.
  • Should have: important, but not absolutely mandatory.
  • Could have: not essential, but wanted and nice to have.
  • Will not have (this time): not needed.

The same article warns that without a clearly scoped timeline, everything starts to feel like a must have. A practical test: for each must, ask "would we refuse to launch without this?" If the honest answer is no, it is a should.

For the HVAC company, job lists, parts recording and the office view are musts. Customer signatures might be a should. Automatic text alerts to customers when a technician is on the way are a could. A customer self-service portal is a will-not-have for the first release.

Priorities also make quotes more useful. Ask agencies to price the musts on their own, then the shoulds and coulds as separate items. You will see what a lean first release costs, which is the idea behind a minimum viable product.

What about data and integrations?

Software is mostly about data, and the data section is where many requirements documents are thinnest. Answer these questions:

  • What records does the system hold? Customers, jobs, parts, technicians, invoices. List the main fields for each, even roughly.
  • Where does that data live today? Spreadsheets, an existing system, paper. Say how much there is and whether it needs to be moved in.
  • Which systems must it connect to? Name the actual products, such as your accounting software, CRM, calendar or payment processor, and say what should flow in each direction and how often.
  • What personal or sensitive information is involved? Names, addresses, phone numbers, payment details, health information. The FTC's Start with Security guide includes a simple rule under its first lesson: do not collect personal information you do not need.
  • Who owns the data and how do you get it out? Ask for exports in a standard format at any time.

Integrations deserve extra care, because each one depends on the other product's API (the published way software exchanges data). Some products have good APIs and some have limited ones, and agencies will want to check before committing. If connecting systems is most of your problem, the integrations work may matter more than any new screens.

What are non-functional requirements?

These describe how well the system must work rather than what it does. Owners often skip them because they seem obvious, but "obvious" is exactly what agencies price differently.

  • Security. Who can log in and how (for example, multi-factor login for office staff), how access is limited by role, and how long data is kept. The FTC guide recommends putting appropriate security standards into contracts with service providers. If you want a recognized reference, the OWASP Application Security Verification Standard is a list of web application security requirements that its authors say can also serve as a basis for security requirements in contracts. You can simply ask agencies how they would use it.
  • Performance and availability. How many people use it at once, how fast key screens need to load in practice, and what happens if it goes down during business hours. Describe it in business terms: "a technician in a basement with weak signal must still be able to finish a job."
  • Accessibility. If customers or staff with disabilities will use it, say so and name a target. The W3C's WCAG 2 overview explains the standard and its three conformance levels, A, AA and AAA. Our guide to website accessibility covers the background.
  • Compliance. Name any rules that apply to your data or industry, such as health, payment card or financial records rules. Requirements here should come from your attorney or compliance advisor, not from the agency or from this guide.
  • Devices and browsers. Phones only, desktops only, both; iPhone, Android or both.
  • Support and ownership. Who hosts it, who fixes bugs after launch, and that you receive the source code, documentation and account access.

Why does "out of scope" matter so much?

Because what you leave unsaid, someone will assume. An out-of-scope list is a short set of plain statements about what this project will not do, and it prevents more disputes than any other section.

For the HVAC company:

  • No customer-facing portal or app in this release.
  • No changes to the accounting system itself; the job app sends data to it.
  • No inventory management beyond recording parts used.
  • No migration of job history older than the current year.

It also turns vague future ideas into a visible list for a later phase.

How detailed should the document be?

Detailed enough that two agencies would picture the same product, and no more. For most small business projects, that is a handful of pages plus the role table and user stories. You are not writing a technical specification; you are writing a shared understanding.

Signs you have gone too far:

  • You are choosing programming languages, databases or hosting providers without a real reason.
  • You have designed every screen yourself. Rough sketches help; finished designs usually belong to a product design phase.
  • You are writing stories for features you marked as "could have."

Signs you have not gone far enough:

  • A role, an integration or a data source is mentioned only in passing.
  • Stories have no acceptance criteria.
  • Nothing is marked out of scope.

Mark what you do not know as open questions rather than guessing. "We are not sure whether technicians need to work offline" is far more useful to an agency than a confident guess that turns out wrong.

How do you use it to get comparable quotes?

Send the same document, in the same version, to every agency you ask. Then ask each one to respond in the same structure:

  1. Their understanding of the problem, in their own words.
  2. A price and assumptions for the must-haves alone, then for each should and could.
  3. Questions and risks they see, especially around integrations and data.
  4. What they would change or cut, and why.
  5. What happens after launch: hosting, support, updates and ownership.

The quality of their questions is one of the best signals you will get. An agency that asks about the technician working in a basement has read the document. One that sends a price with no questions has probably priced a project it imagined.

Lay the answers side by side in a table, the same way you would compare website proposals. Big gaps in price usually mean different assumptions, so find the assumption before you judge the number. For a sense of scale, our pricing page has rough US ranges, which are estimates, not offers.

A fill-in requirements template

Copy this into a document. Write "unsure" rather than guessing.

1. Problem statement

  • Today, the process works like this: ___
  • It breaks down when: ___
  • It costs us (time, errors, revenue): ___
  • Success looks like: ___

2. Users and roles

  • Role: ___ | How many: ___ | Device: ___ | Can do: ___ | Cannot do: ___
  • (Repeat for each role.)

3. User stories

  • As a ___, I need to ___, so that ___.
  • It's done when: ___ / ___ / ___
  • (Repeat for the main tasks of each role.)

4. Priorities

  • Must have: ___
  • Should have: ___
  • Could have: ___
  • Will not have this time: ___

5. Data and integrations

  • Main records and key fields: ___
  • Where the data lives today and how much: ___
  • Systems to connect, and what flows each way: ___
  • Personal or sensitive data involved: ___

6. Non-functional needs

  • Security and login: ___
  • Performance and availability: ___
  • Accessibility target: ___
  • Compliance rules (confirmed with an advisor): ___
  • Devices and browsers: ___
  • Hosting, support and ownership: ___

7. Out of scope

  • This project will not: ___

8. Open questions

  • ___

9. Practical details

  • Decision maker and main contact: ___
  • Budget range or constraint, if you are willing to share it: ___
  • Any fixed date the business depends on, and why: ___

A property management firm, a manufacturer and an HVAC company will fill these sections very differently. The HVAC, property management and manufacturers pages describe the systems those businesses tend to run.

When your draft is ready, you can describe the project and get a free quote from an agency that fits it.

Questions

Do I need technical knowledge to write a requirements document?

No. The most useful parts, the problem, the users, the tasks and the rules of your business, come from people who know the work, not from developers. Leave technology choices to the agency and ask them to explain their reasoning in plain words.

Should I sign an NDA before sharing the document?

If the document describes something genuinely confidential, such as pricing logic or a process competitors would copy, asking for a simple NDA is reasonable and most agencies will sign one. For an ordinary internal tool, many owners share a version with sensitive details removed and fill them in later. A business attorney can tell you what level of protection fits.

What is the difference between a requirements document and a statement of work?

The requirements document is yours: it describes what you need. The statement of work is usually written by the agency after discovery and describes what they will deliver, how, and on what terms. A clear requirements document makes the statement of work easier to check against your needs.

Should the agency write the requirements for me?

Many agencies offer a paid discovery phase in which they interview your staff and produce detailed requirements. That is often worth it for a large project. Writing your own first draft still helps, because it gets you comparable quotes for the discovery work and keeps the business decisions in your hands.

How often should the document change once the project starts?

Expect it to change. Requirements get clearer as people see working screens. Agree up front on how changes are requested, estimated and approved, so updates are deliberate rather than drifting in through conversations.

Sources

  1. Writing user stories - Service Manual - GOV.UK
  2. 5 Prioritization Methods in UX Roadmapping
  3. WCAG 2 Overview
  4. OWASP Application Security Verification Standard
  5. Start with Security: A Guide for Business

Free quote

Tell us about your project

Answer a few short questions. A specialist from the team we match you with will call you with a free quote.

  • Free
  • No obligation
  • About two minutes

Take a break

Press space or tap to run, up arrow or tap to jump. Mind the dinosaurs. It only runs while you are looking at it.