Cloud migration services
Moving to the cloud means deciding, workload by workload, whether to rehost, rework or retire. Cloud migration services inventory your systems, plan the order of moves, run the cutovers and set up the new environment so it can be operated. Dinozoom connects you with agencies that offer this work.
Get a free quoteWhat is included
What Cloud migration projects can cover
-
Discovery and inventory
A list of servers, applications, dependencies, licenses and data stores, including systems nobody remembers owning.
-
Migration strategy per workload
A choice for each system among rehosting, replatforming, refactoring, repurchasing as a SaaS product, retaining in place or retiring it.
-
Landing zone setup
Accounts, networking, identity, logging and guardrails prepared before any workload moves.
-
Data and database migration
Replication or export of databases and files, with checks that the copy matches the source.
-
Cutover planning
Sequenced moves with rehearsals, a freeze window where needed and a defined route back.
-
Post-migration optimization
Sizing reviews, cost reporting and clean-up of the old environment after the move is stable.
Not included
What Cloud migration projects usually leave out
- Rewriting applications beyond the refactoring listed in scope.
- Cloud provider charges and the cost of running the old and new environments side by side.
- Software license changes that vendors require.
- Decommissioning physical hardware or data center contracts.
- Ongoing application support unless listed.
Process
How Cloud migration projects run
-
Discovery
The agency scans and interviews to build the inventory, maps dependencies between systems and groups workloads into waves based on risk and effort.
-
Build
The target environment is built from code, replication is set up and each workload is prepared with the changes its strategy requires.
-
Test
Test migrations are run for each wave, with checks on data integrity, performance, access and the connections to other systems.
-
Launch
Cutovers follow the rehearsed plan, with monitoring on the new side and a rollback path until the business accepts the result.
-
Support
After cutover the agency hardens the new environment, watches cost and performance and, once the business accepts the result, decommissions the old servers and snapshots.
Engagement models
Ways agencies usually structure the work
-
Fixed scope
Suits a migration with a known inventory, such as moving a defined set of servers and databases, where waves and targets can be listed.
-
Time and materials
Fits large estates where discovery turns up surprises and the wave plan is adjusted as work proceeds.
-
Retainer
Continues past cutover for later waves of workloads, right-sizing and cleanup of resources the first waves left behind.
-
Pilot first
Migrate one low-risk workload through the new landing zone, which exercises accounts, networking, cutover steps and cost reporting.
Platforms
Platforms and tools this work often uses
Security
Security and privacy to expect
-
Data in transit during migration
A matched agency may encrypt replication traffic, use private connectivity where practical and restrict who can reach the staging copies.
-
Cleanup of the source and staging data
Ask how old servers, snapshots and temporary storage are wiped or removed after cutover, since forgotten copies are a common exposure.
-
Shared responsibility
Agencies can document which security tasks move to the cloud provider and which remain yours, such as patching guest operating systems.
-
Licensing and residency constraints
Check whether data location rules or vendor licenses affect where a workload may run.
Choosing an agency
What to check before you pick an agency
- Does it start from a real inventory and dependency map, or from assumptions?
- How does it choose between rehost, replatform and refactor for each system?
- What is the rollback plan for each cutover?
- How will data integrity be verified after each move?
- What cost model will it use to compare the old and new environments?
- Which tasks stay with our team after the migration?
Cost drivers
What moves the price of Cloud migration
- Number of servers, applications and databases
- Dependencies and legacy technologies
- Chosen strategy per workload
- Data volume and downtime tolerance
- Security and compliance controls
- Parallel running of old and new environments
- Training and handover
Related
Related services
How it works
From request to a free quote
-
Tell us what you need
Answer a few short questions about your project in our quote form.
-
We match you with an agency
We share your request with the team that fits the project.
-
Get a free quote
A specialist from the agency calls you, talks it through and sends a free quote.
Questions
Questions about Cloud migration
What are the usual migration strategies?
Common options are rehost (move as is), replatform (swap parts for managed services), refactor (redesign for the cloud), repurchase (switch to a SaaS product), retain (leave in place) and retire (switch off), and some lists add relocate. Most estates mix several, so ask the agency to explain its choice for your biggest system.
Will moving to the cloud lower our costs?
Not automatically. Rehosting unchanged servers can cost more than a well-run data center, while managed services and right-sizing can help. Build a cost comparison for your own workloads before committing.
How much downtime should we expect?
It depends on the data size, replication method and how much your business can tolerate. Some moves use replication so the cutover is brief, while others need a longer freeze. Agree the window in advance.
What is a landing zone?
It is the prepared cloud foundation: accounts, networks, identity, logging and guardrails. Building it first can spare you from reorganizing the environment after workloads have moved in.
What if an application cannot move?
Some systems depend on special hardware, licenses or latency to a local device. Retaining them in place, with secure connectivity to the cloud, is a recognized choice and not a failure.
Who is responsible for security afterward?
Under the shared responsibility model the provider secures its infrastructure, and you secure what you configure and run. Ask the agency to write down that split for your workloads.
How do we decide between AWS, Azure and Google Cloud?
Look at existing Microsoft or Google agreements, team skills, regional availability and the specific services you need. A proof of concept on a representative workload is often the clearest test.